Bowling Green Tinder Drive

27 Aug 2012
1
Asphalt driveway located on Tinder Dr in Bowling Green Virginia. This job consisted of an existing driveway with an addition where 21A gravel was added for expansion. This whole project was completed, swept up, and our crew on to the next one within several hours.

20120827-185815.jpg

20120827-185846.jpg
1

Dahlgren Shell Gas Station Resurface

25 Aug 2012
This Shell gas station located in Dahlgren, Virginia had been paved several times. With a situation like this, it required the parking lot to be milled. Asphalt milling is when a layer of existing asphalt is removed in order to maintain the same drainage and being able to tie flush into concrete and curbing. Once that is completed the parking lot is then resurfaced with 2" of asphalt. This project did not shut their business down allowing the customers to still be able to use it while the whole process was taken care of and completed within one day!

20120824-202517.jpg

20120824-202535.jpg

20120824-202556.jpg

20120824-202630.jpg

20120824-202647.jpg

20120824-202704.jpg
0

Locust Grove Asphalt Roadway

23 Aug 2012
This roadway located in Locust Grove Virginia had numerous areas that were in very bad condition. That being said, the HOA (home owners association) had us come in and replace the entire road. Although it being a large development we were still able to complete their entire project in one day with traffic being able to use it while we were in the process.

20120823-075226.jpg

20120823-075251.jpg

20120823-075259.jpg
0

Fox Point Asphalt Driveway

22 Aug 2012
This driveway was already paved but with all the soft areas and cracks it needed to be removed and replaced. This driveway was removed, applied base, and paved all within a half a day.

20120821-215306.jpg
0